| S. No. | Name of Work | Name of Client | Location | Project Value (In Cr.) |
1 |
Construction of a Pipe Irrigation System to Supply Water Through the Rising/Gravity Mains by Pressurized Pipeline System forSip Amber Irrigation Complex Project. |
Government Of Madhya Pradesh Water Resource Department Chief Engineer Chambal Betwa Basin Bhopal M.P. |
Sehore |
341.23 |
2 |
Construction, Operation and Maintenance of Dobi Irrigation Scheme, With Pump House and All Ancillary Works, Piped System for Feeding 3.11 Comecs Water in Existing Barna Project Canal System and Construction of Complete Pressurized Micro Irrigation System With 1.01 Cumecs Discharge For 2883 Ha. CCA To Deliver Water at Farmers Fields with a Duty Of 0.35 Lit/Sec/Ha, Oms At 20 Ha. Chak With 10 Times Duty From 20 Ha. To 2.50 Ha. Chak With At Least 23 Meter Residual Head at Highest Point of Each 2.50 Ha Chak with Power Requirement Not Exceeding 3.70 MW. |
Government Of Madhya Pradesh Narmada Valley Development Department Chief Engineer Indira Sagar Project (Canals) Sanawad Distt.Khargone (M.P.) |
Sehore |
224.00 |
3 |
Construction of a Pipe Canal system to supply water through the Rising /Gravity mains by pressurized pipeline system for micro irrigation to deliver at farmers field upto 1 ha with a duty of 0.35 lit/sec/ha and maintained up to 30 ha chak, keeping the discharge of minimum 10 times the duty at one hectare and at least 20 Meter Residual Head at each 1 ha chak for Kadan Micro Pressurized Irrigation. |
Project Administrator, Bina PMU Water Resources DepartmentSagar (M.P.) |
Sagar |
140.99 |
4 |
Supplying of water from Left side of Pench Dam basin by lifting and delivering at farmer’s field @ duty 0.36 litre/sec/ha through pressurized pipeline system for micro irrigation in the Culturable command area of 10300 hectare out of Gross command area of nearly 17150 hectares for Jamuniya Micro Irrigation System. |
Executive Engineer Pench Diversion Project Canal Division Singna Tehsil Chauraidistt Chhindwara (M.P.) |
Chhindwara |
134.11 |
5 |
Construction of Aqueduct / Syphon Aqueduct on Tamas River for Main Canal of Teonthar Flow Irrigation Scheme. |
Executive Engineer Teonthar Canal Division Sirmour Distt. Rewa, (MP) |
Rewa |
102.82 |
6 |
Construction of a Pressure Irrigation System to Supply Water Through the Rising/ Gravity Mains by Pressurized Pipeline System for Micro Irrigation to Deliver at Farmers Field Upto 5 Ha, With A Duty Of 0.35 Lit/Sec/Ha and Maintained Up To 30 Ha Chak for Teonthar Micro Irrigation Project. |
Government Of Madhya Pradesh Water Resource Department Executive Engineer Teonthar Canal Division Sirmour Distt. Rewa |
Rewa |
92.82 |
7 |
Construction of Adhartal Ramp And Damoh -Patan Ramp Road (With Damaoh Naka Rotary) In Jabalpur Elevated Corridor Project from Damoh Naka- Ranital Chowk Madan Mahal (Upto Medical Road) in the Jabalpur City of Madhya Pradesh – Damaohnaka Ramp Extension |
Government Of Madhya Pradesh Public Works Department Chief Engineer, Central Zone Jabalpur, PWD |
Jabalpur |
82.46 |
8 |
Development of Sidhi City Portion Road in Km 74 to 83/4 on NH-75 Extn. Road. (Total length 9.40 Km) |
Executive Engineer PWD Division, Sidhi (M.P.) |
Sidhi |
44.33 |
9 |
Construction of New Railway Over Bridge on Varanasi Nagpur Road (NH-7) near Railway Station Rewa at Railway CH-890M across Rewa Sidhi New Railway line at Godhar Distt. Rewa (M.P.) |
Executive Engineer PWD Bridge Construction Division, Rewa (M.P.) |
Rewa |
35.04 |
10 |
Restructuring and Modernization of Samrat Ashok Sagar Project. |
Executive Engineer Samrat Ashok Sagar Project Division No.-2 Vidisha (M.P.) |
Vidisha |
34.94 |
11 |
Construction of Pench Valley Group Water Supply Scheme- Head Work (Mandhan Dam) / |
Executive Engineer PHE Project Division Chhindwara (M.P.) |
Chhindwara |
32.44 |
12 |
Construction of Sidhi to Sirsi Road L-28.30 KM Under Sub Division Sidhi, Distt. Sidhi (M.P.). |
Executive Engineer PWD Division, Sidhi (M.P.) |
Sidhi |
26.55 |
13 |
Construction of Fly-Over Bridge at SirmourChouraha Rewa on Varanasi Nagpur Road at Km. 234/6 in Rewa city NH 7 M.P. |
The Executive Engineer PWD Bridge Construction Division, Rewa M.P.) |
Rewa |
20.33 |
14 |
Construction of Aqueduct at RD 30725 M and 40100 M of Mahan Main Canal. |
Executive Engineer Mahan Canal Division Sidhi (M.P.) |
Sidhi |
18.95 |
15 |
Construction of industrial Infrastructural Development Works for Upgradation of Industrial Area, At Udyog Vihar churatha, Dist.Rewa |
Managing Director Madhya Pradesh Audyogik Kendra Vikash Nigam (Rewa) Ltd. Rewa (M.P.) |
Rewa |
17.58 |
16 |
Construction of Purwa Main Canal from KM. 12.80 to 31.00, Including Balance Earthwork and 31 Nos. Structures, (Excluding Proposed Aqueducts Km. 21.75) with 1 Nos. Distributory, 9 Nos. Minors under contract PCP-4. |
Executive Engineer Upper Purwa Canal Division, Rewa (M.P.) |
Rewa |
15.33 |
17 |
Reconstruction and Modernization of Gurma Tank and its Canal System in Rewa District |
Executive Engineer WRD Division Rewa (M.P.) |
Rewa |
14.72 |
18 |
Construction of earth Dam, Spillway, Deck bridge, 2 no’s of sluices of BagharruMadium Project |
Executive Engineer, Water Resources Division,Vidisha (M.P.) |
Vidisha |
11.00 |
19 |
Construction of Aqueduct at KM 21.75, 41.01, 56.26 & 64.60 of Purwa Main Canal (at Lilji Nala, Kariyari Nala, Nar Nala, Magardaha Nala Respectively.) |
Executive Engineer Purwa Canal Divi. No. 2 Satna (M.P.) |
Satna |
10.72 |
20 |
Construction of Coffer dam and 2 nos. Sluice at RD 457.57 (Left Bank) & RD 5100 M (Right Bank) of Pench Division Dam Except Earth of Bund in Sluice portion Pench Division Project. / |
Executive Engineer Pench Divrsion Project Water Resource Division No.- 1 Chourai, Chindwara (M.P) |
Chhindwara |
10.67 |
21 |
Construction of high-level bridge include approach road across Bais River in Km. 2 of Udaigiri-Dholkhedi road Distt. Vidisha. (M.P) |
Executive Engineer PWD Bridge Const. Division, Bhopal |
Vidisha |
10.45 |
22 |
L -Earth Work on bund, construction of flush bar, Head Sluice, Approach & Spill Channel, Chute Falls, Construction of Canal, Canal Structure and Canal Lining of Bichhli Nalla Tank Scheme |
Executive Engineer W.R. Division. No. 2 Shahdol (M.P.) |
Shahdol |
10.20 |
23 |
Construction of High-Level Bridge Across Tawa River at Rajdhoghat On Sarni-LoniyaRaod Including Approch Road Distt. Betul |
Executive Engineer PWD Bridge Construction Division, Bhopal (M.P.) |
Betul |
9.73 |
24 |
Construction of Submersible Bridge including Approach Road across sone river near village Bhitari on Rampur Ghunghuta Khaira Road Distt. Sidhi M.P |
Executive Engineer PWD Bridge Construction Division Rewa M.P. |
Sidhi |
7.75 |
25 |
Construction of E/w of Keoti Canal from KM. 32.75 to 41.41 i/c 12 Nos. Structures and balance E/w of SirmourDistributory from Km 0 to 17 i/e 28 Nos. Structures of Bansagar Project. |
Executive EnigneerKeoti Canal Division Rewa (M.P.) |
Rewa |
7.41 |
26 |
Restructuring & Modernization of Ratapani tank & their canal system. |
Executive Engineer WRD Raisen (M.P.) |
Raisen |
5.80 |
27 |
Construction of Submersible Bridge Including Approach Road Across Myar River On Chachar- Kulhai (Kulhaniya) Road Distt. Singrauli. |
Executive Engineer PWD Bridge Construction Division, Rewa (M.P.) |
Singrouli |
5.74 |
28 |
Restructuring & Modernization work of MauganjChhuhiya& Padar Tank and their canal System in Rewa Distt. |
Executive Engineer WRD Rewa (M.P.) |
Rewa |
5.65 |
29 |
Construction of Submersible Bridge including approach road in km 1/2 across Jhapar River near Village Bhamraha on Bhamraha Gorakhpur Road Distt. Shahdol (M.P.) |
Executive Engineer PWD Bridge Construction Division, Rewa (M.P.) |
Rewa |
5.45 |
30 |
Strengthening of Bhamraha To Rashpur Road length 4.40 km Under Sub Division Beohari (M.P.) |
Executive Engineer, P.W.D. (B/R) Division, Shahdol (M.P.) |
Shahdol |
4.26 |
31 |
KarondiBijouri Road Length= 15 Km. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
3.83 |
32 |
Construction of Bridge across Johilla River on Pali Raipur Road in KM 12/10. |
Executive Engineer PWD Bridge Const. Divi. Rewa (M.P.) |
Rewa |
3.59 |
33 |
Construction of Keshwani to Bamhani Road Length 5.00 KM |
Executive Engineer PWD (B/R) Division Anuppur (M.P.) |
Anuppur |
3.34 |
34 |
Restructuring & Modernization of Banchore Tank & their canal System. |
Executive Engineer WRD Raisen (M.P.) |
Raisen |
3.15 |
35 |
B.T.R. on Anuppur Venkanagar Road = 14 Km. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
2.38 |
36 |
Construction of Nandanpur Tank. |
Executive Engineer Upper Purwa Canal Divi. Rewa (M.P.) |
Rewa |
2.37 |
37 |
B.T.R. on NonghatiDamehari Road Km. 1 to 9 & 18 to 21= 16 Km. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
2.05 |
38 |
Construction of Juda Tank Scheme. |
Executive Engineer Upper Purwa Canal Divi. Rewa (M.P.) |
Rewa |
1.88 |
39 |
Restructuring & Modernization of Karmodia Tank & their canal system. |
Executive Engineer WRD Raisen (M.P.) |
Raisen |
1.32 |
40 |
B.T.R. on Leela Tola Medhakhar Road Km. 1 to 7.80 &LeelatolaSeoni Sangam Road 2.20 Km. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
1.31 |
41 |
Construction of Earthen Dam, Head Sluice, Waste Weir, Spill Channel and Earth work on bund of Pitamber Garh Tank. |
Executive Engineer WRD Rewa (M.P.) |
Rewa |
1.22 |
42 |
Construction of high-level bridge (total length 88.0 mtrs) at River Mandhan under Pench valley group water supply project. |
Executive Engineer PHED Division, Chhindwara (M.P.) |
Chhindwara |
1.17 |
43 |
Construction of Earthen Dam, Head sluice, Waste weir, Excavation of spill and approach channel of Patnari Tank Scheme. |
Executive Engineer WRD Rewa (M.P.) |
Rewa |
1.13 |
44 |
Construction of LalganjTanj |
Executive Engineer Water Resources Survey Division Rewa (M.P.) |
Rewa |
1.07 |
45 |
Construction of Jaithari to Jhaital Road Length 3.80 KM. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
0.73 |
46 |
B.T.R. on Gourela Manikpur Road Length 01 to 0 = 05 KM |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
0.42 |
47 |
B.T.R. on Rajendragram Dharamdas Jaitahari Road 1 to 4 Km. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
0.40 |
48 |
B.T.R. on Anuppur town Road Length 2 Km. |
Executive Engineer PWD (B.R.) Div. Anuppur (M.P.) |
Anuppur |
0.25 |